Treasure Island Septic to Sewer Project
Engineering Phase:
This project will provide a Preliminary Design Report (PDR) that will utilize data that was prepared by others (Eckler Engineering) in October 2016, along with the off-site force main hydraulic model and associated Environmental Assessment. The project will also include the preparation of design plans, permitting and bidding assistance utilizing a vacuum sewer system for the elimination of septic tanks within the Treasure Island area and a lift station/force main in Kings Bay area for the abandonment of the existing WWTF.
To meet the OUA's project funding schedule, the project will be designed in either two (2) or three (3) phases, defined as the North System (Phase 1) and South System (Phase 2), with Kings Bay possibly being Phase 3. The force main and associated pump stations will either be a sub-phase or a standalone phase. The final phasing will be determined as part of the PDR.